CVEN 473
Engineering Project Estimating and Planning
Texas A&M University · UGRD · Fall 2026
1 section
Catalog description
Credits 3. 2 Lecture Hours. 3 Lab Hours. Application of cost estimating and planning techniques for civil engineering projects; introduction to labor, materials and equipment costing; productivity analysis; indirect and general overhead costs; preparation of approximate and definitive estimates; and integration of time/cost relationships through critical path method and resource leveling. Prerequisites: Grade of C or better in CVEN 349 ; senior classification.
Sections
Current meeting, instructor, credit, and enrollment details
001
Availability not recently verifiedClass #texas_am-2571Fall 2026UGRD
- Days & times
- No scheduled meeting time
- Meeting dates
- —
- Location
- —
- Instructor
- Staff
Class numbers and section codes come from the registrar.
Spot missing or incorrect course data?