Loading course details…
Loading course details…
Pierpont Community & Technical College · 3.000 credits · UGRD

3 hr(s). This course trains the student in considerations that go into designing a well completion. The course covers the following topics: choices for cementing and casing program design, hydraulic fracturing and acidizing the scenarios, and specialized equipment utilized. Students will explain a typical slickwater fracture treatment along with the process of drill-out and flowback operations. Prerequisite(s): PTRM 1104 and PTRM 1109 with a grade of “C” or better Restriction(s): Applied Process Technology, Electric Utility Technology, and Petroleum Technology majors only
Fall 2026 · 1 section
Aug 24 – Dec 11
| Section | Days & time | Location | Instructor |
|---|---|---|---|
| 001Class #10632 | Tu Th · 1:00 – 2:20 PM | Advanced Technology Center 223 | Joseph J Filchock |