SUR 212
Route and Construction Surveying
Pennsylvania State University-World Campus · UGRD · Fall 2026
Catalog description
Circular, compound, spiral horizontal curves; equal, unequal tangent vertical curves; alignments, earthwork; control, building, pipe, street, and as-built construction surveys. SUR 212 Route and Construction Surveying (4) SUR 212 builds directly upon the fundamental surveying principles presented in SUR 111 (Plane Surveying), particularly traverse methods and coordinate geometry calculations. The course covers the fundamental geometric computations for street alignment design starting with simple circular, compound circular and spiral horizontal curves. This includes computation for intersection angles, radius, length, tangents, degree of curvature, stationing and stake-out calculations using coordinate geometry methods. The topics of vertical curve analysis follow which includes street grade, rate of change of grade, stationing, low and high points, passing a curve through fixed point and other alignment related analysis and design. Both equal tangent and unequal tangent vertical curves are discussed. Vertical curves are followed by street cross-sections, templates, slope stake locations, cut/full, earthwork computations and other aspects of 3-D alignment design. Once curve geometry and street alignment calculations are covered, the course moves into field stake-out methods for construction. Street alignment stake-out is covered first, using industry standard software with traditional and RTK-GPS equipment. A road alignment project is used to combine the aspects of geometric analysis and design with field stake-out methods including a control survey. Beyond street stake-out, other construction surveys are addressed including building, pipe line, culverts, storm and sanitary sewers, as-built and other construction related surveys. The laboratory exercises present field methods for construction projects in accordance with design specifications. Computations of earthwork volumes are also covered for other construction projects beyond that of street alignments.
Sections
Current meeting, instructor, credit, and enrollment details
001
Availability not recently verified- Days & times
- No scheduled meeting time
- Meeting dates
- —
- Location
- —
- Instructor
- Staff