WDT 269
BOILER TUBE LAB
Northeast Alabama Community College · UGRD · Fall 2026
1 section
Catalog description
This course is designed to provide the student with the skills in welding boiler tubes using the gas tungsten arc and shielded metal arc welding process using filler metals in the F6 and F4 groups to applicable code. Emphasis is placed on welding boiler tubes using the gas tungsten arc and shielded metal arc welding process in the 2G and 6G positions in accordance with the applicable code. Upon completion, students should be able to perform gas tungsten arc and shielded metal arc welding on boil
Sections
Current meeting, instructor, credit, and enrollment details
001
Availability not recently verifiedClass #WDT-269Fall 2026UGRD3 credits
- Days & times
- No scheduled meeting time
- Meeting dates
- —
- Location
- —
- Instructor
- Staff
Class numbers and section codes come from the registrar.
Spot missing or incorrect course data?