CE-UY 3513
Construction Scheduling
New York University · UGRD · Fall 2026
1 section
Catalog description
Students learn to apply the Critical Path Method (CPM) to construction projects, using precedence diagram networks. The course covers sequencing, cost allocation, updating, cash flow, resource constraints and scheduling, manpower leveling and distribution, time-scale networks, lead and lag-time constraints, time-cost tradeoffs, overlap and other specific leading edge scheduling techniques. Students direct an entire project from planning through scheduling and control, both manually and through software. | Prerequisite: Two CE-UY 25xx courses.
Sections
Current meeting, instructor, credit, and enrollment details
001
Availability not recently verifiedClass #new_york-CEUY3513Fall 2026UGRD3 credits
- Days & times
- No scheduled meeting time
- Meeting dates
- —
- Location
- —
- Instructor
- Staff
Class numbers and section codes come from the registrar.
Spot missing or incorrect course data?