Loading course details…
Loading course details…
Metropolitan State University of Denver · 3 credits · UGRD

Prerequisite(s): ARCH 2003 OR CET 2003 OR CPM 2100 with a C or above Prerequisite(s) or Corequisite(s): CET 3100 or permission of Instructor Students gain a basic understanding of the methods used to prepare a construction project cost estimate. The students use plans and specifications to do quantity takeoffs to determine costs and assemble a lump sum bid. This course is a prerequisite or corequisite of CET 3100, Construction Methods.
Fall 2026 · 1 section
Aug 17 – Dec 13
| Section | Days & time | Location | Instructor |
|---|---|---|---|
| 001Class #51456 | Mo We · 3:30 – 4:45 PM | Aerospace and Engineering Sci. 395 | Canterbury,Bill |