CAR 151

Concrete Formwork Lab

Jefferson Community and Technical College · UGRD · Fall 2026

1 sectionNo open sections · 1 checked
Add to a schedule

Catalog description

Introduces heavy and commercial concrete form construction methods. Provides instruction on the application of information about the properties of concrete, rigging, concrete wall form systems, above grade floor systems, vertical piers and column form systems, on grade curb forms, horizontal beam forms, fire-proofing encasement forms, bridge and deck forms. Introduces OSHA construction standards on Concrete and Shoring, and Excavations. Laboratory: 2 credits (60 contact hours).

Sections

Current meeting, instructor, credit, and enrollment details

Updated 4 hours ago

60L1

FullSeats: 18/18 seats Last recorded: Aug 15, 2026, 5:56 PM
Class #87059Fall 2026UGRD2.00 credits
0 available18 enrolled18 capacity
Days & times
Th · 9:30 AM – 3:30 PM
Meeting dates
2026-10-14 - 2026-12-13
Location
Technical Campus Bldg B Rm 130 130
Instructor
Joshua Lichtsteiner

Section notes

Instructional method: IP; BP

Details checked 4 hours agoSeats checked 4 hours ago
Class numbers and section codes come from the registrar.
Spot missing or incorrect course data?