CAR 151
Concrete Formwork Lab
Bluegrass Community and Technical College · UGRD · Fall 2026
1 sectionNo open sections · 1 checked
Catalog description
Introduces heavy and commercial concrete form construction methods. Provides instruction on the application of information about the properties of concrete, rigging, concrete wall form systems, above grade floor systems, vertical piers and column form systems, on grade curb forms, horizontal beam forms, fire-proofing encasement forms, bridge and deck forms. Introduces OSHA construction standards on Concrete and Shoring, and Excavations. Laboratory: 2 credits (60 contact hours).
Sections
Current meeting, instructor, credit, and enrollment details
1501
FullSeats: 17/16 seats Last recorded: Aug 15, 2026, 5:56 PMClass #81245Fall 2026UGRD2.00 credits
0 available17 enrolled16 capacity
- Days & times
- Mo We · 11:00 AM – 12:40 PM
- Meeting dates
- 2026-08-17 - 2026-12-13
- Location
- Room 110 Building B-Leestown 110
- Instructor
- Ezra Sword
Section notes
Instructional method: IP; BP
Details checked 3 hours agoSeats checked 3 hours ago
Class numbers and section codes come from the registrar.
Spot missing or incorrect course data?